Introduction to the ABS Single Point Mooring Rules
The American Bureau of Shipping (ABS) Rules for Building and Classing
Single Point Moorings, July 2026, establish classification
requirements applicable to the design, construction, equipment,
testing and survey of single point mooring (SPM) systems within the
scope of the Rules.
An SPM is an offshore mooring arrangement that enables a vessel to
connect at a single point and, where applicable, weathervane in
response to environmental conditions. The configuration may include
a buoy or platform, anchoring and mooring components, cargo transfer
equipment, hoses or flexible risers, swivels, product piping and
associated safety systems.
The July 2026 edition is arranged in five Parts. Together, these
address conditions of classification, materials and welding, mooring
system design, equipment and systems, and testing and surveys.
The Rules should be read as a coordinated technical framework rather
than as a stand-alone design checklist.
Important classification distinction:
The ABS SPM Rules state that they are mainly applicable to SPM systems
designed for temporarily moored vessels. For vessels that will be
permanently moored to an SPM, the Rules refer to Part 3B and Part 3C
of the ABS Rules for Building and Classing Offshore Units. The
applicable classification basis must therefore be established for
the actual installation and operating concept.
What Is Updated in the July 2026 Edition?
The Foreword to the July 2026 edition identifies specific changes to
the annual survey requirements. These changes place additional
emphasis on the review of maintenance and replacement records and
extend the listed annual survey scope to further SPM components and
systems.
Maintenance and Replacement Records
The annual survey requirements include review and verification
of maintenance and replacement records for specified SPM
equipment and systems, with reference to the approved
Information Booklet and Maintenance Manual.
Marine Breakaway Couplings
Marine Breakaway Couplings (MBCs) are expressly included in
the annual survey list of equipment and records to be reviewed
as applicable to the SPM arrangement.
Safety Devices
Safety device testing is included in the annual survey
requirements where such devices are provided.
Hull Mooring Connections
The annual review of mooring system maintenance and replacement
records expressly includes the connection points to the SPM
hull.
PLEM Class Scope
The July 2026 requirements clarify that PLEM testing is
included in the annual survey list when the PLEM forms part
of the classification scope.
Approved Maintenance Information
The approved Information Booklet and Maintenance Manual are
to be available to the attending Surveyor, and the maintenance
and replacement records are reviewed against the approved
documentation.
Edition control:
The points above are the changes specifically identified in the
July 2026 Foreword and the revised annual survey provisions. They
should not be interpreted as meaning that every other technical
requirement in the Rules is new in 2026.
Structure and Organization of the ABS SPM Rules
The July 2026 Rules are divided into five main Parts. Each Part
addresses a different stage or technical aspect of the SPM
classification process.
Part 1 – Conditions of Classification
Addresses SPM-specific classification conditions, symbols
and notations, plans and design data to be submitted, and
the Information Booklet and Maintenance Manual. Part 1 is
used together with the ABS Rules for Conditions of
Classification – Offshore Units and Structures (Part 1B).
Part 2 – Materials and Welding
Refers to the applicable ABS materials and welding
requirements. For structures and connections typical of
offshore structures, such as towers, jackets and similar
steel non-buoyant structures, the Rules direct the reader
to the relevant offshore materials and welding provisions.
Part 3 – Mooring System Design
Covers general design matters, site and environmental
conditions, material selection, design loads, structural
design, weld design, stability, anchoring and mooring
equipment.
Part 4 – Equipment and Systems
Addresses cargo or product transfer systems, ancillary
systems and equipment, hazardous areas and electrical
installations, safety provisions and offshore charging
connections.
Part 5 – Testing and Surveys
Covers testing during construction, surveys after
construction, drydocking surveys or equivalent examinations,
annual surveys, special periodical surveys and the
requirements for offshore charging stations.
SPM Design Basis and Environmental Conditions
The design of an SPM depends on the site conditions, the intended
operating concept, the vessel characteristics and the loads
transmitted through the mooring arrangement. The ABS Rules address
site and environmental conditions in Part 3, Chapter 1, and design
loads and structural design in Part 3, Chapter 2.
The design basis should establish the environmental conditions and
operating cases relevant to the installation. These provide the
engineering basis for assessing the buoy or platform, mooring
components, anchoring system and associated structural connections.
Site Conditions
Site-specific conditions and environmental data form part of
the design information used to establish the SPM's design
conditions and operating limits.
Design Loads
The Rules address design loads in Part 3, Chapter 2. The
applicable load cases are to be considered in the design
assessment of the SPM structure and mooring arrangement.
Structural Design
Structural design provisions address the strength and
integrity of the relevant SPM structural components and
connections under the applicable design conditions.
Stability
Part 3, Chapter 3 addresses stability and watertight or
weathertight integrity. The Rules include intact and damage
stability considerations for the SPM buoy.
Damage stability consideration:
The Rules require verification that the buoy has sufficient reserve
buoyancy to remain afloat with at least one compartment adjacent to
the sea damaged, and that the final damage waterline remains below
the first downflooding point. The applicable design assessment is
to follow the referenced ABS provisions.
The design basis should be documented and traceable to the
calculations, drawings, specifications and supporting technical
information submitted for the classification review.
Anchoring and Mooring System Requirements
The anchoring and mooring arrangement is a fundamental part of SPM
integrity. Part 3, Chapter 4 addresses anchoring and mooring
equipment, including anchor points, anchor legs, anchors and chains,
mooring between the vessel and the SPM, structural components and
buoyancy elements.
Anchor Capacity
Anchors are to have adequate holding capacity. For drag
anchor systems, the Rules refer to seabed soil characteristics
when determining anchor holding capacity and require the
anchorage type to be selected with regard to seabed conditions
and maximum design anchor load.
Anchor Legs
The design and arrangement of anchor legs are to be assessed
against the applicable design conditions and mooring system
requirements. The Rules also address the testing of deployed
mooring lines.
Vessel-to-SPM Mooring
The vessel connection may use flexible hawsers or rigid
mooring structures such as rigid arms and yokes. The relevant
equipment and structural connections are addressed by the
Rules.
Mooring Components
Chains, accessories, synthetic mooring lines, wire ropes and
associated components are subject to the applicable
certification, recognized standards and survey requirements
referenced by the Rules.
The Rules describe pull testing of deployed mooring lines in the
presence of an ABS Surveyor, using the applicable approved procedure
and design load criteria. The specific test basis and acceptance
requirements must be taken from the relevant Rule provisions and
approved project documentation.
Engineering focus:
Mooring system assessment should consider the complete load path,
including anchor capacity, anchor legs, connection hardware, buoy
attachment points and the vessel-to-SPM interface. Component
certification alone does not replace assessment of the complete
mooring arrangement.
SPM Equipment and Systems
Part 4 of the ABS Rules addresses the equipment and systems installed
on the SPM. The actual arrangement depends on the SPM type, cargo or
product service, operating concept and approved design.
Cargo and Product Transfer
Cargo or product transfer systems are addressed in Part 4,
Chapter 1. The Rules include requirements relevant to the
transfer arrangement and its associated equipment.
Hoses and Flexible Risers
Hoses and flexible risers form part of the cargo transfer
arrangement. Their design, installation, testing and
associated documentation are addressed in the applicable
provisions.
Swivels and Product Valves
Swivels, valves, flex joints, expansion joints, seals and
associated product piping are among the equipment items
addressed by the Rules and their survey provisions.
Ancillary Systems
Part 4, Chapter 2 addresses ancillary systems and equipment
required for the SPM arrangement and its intended service.
Hazardous Areas and Electrical Systems
Part 4, Chapter 3 addresses hazardous areas and electrical
installations. The Rules also include survey attention to
the maintenance of electrical equipment in hazardous
locations.
Safety Provisions
Part 4, Chapter 4 addresses safety provisions. The wider
system includes safety and shutdown equipment relevant to
the SPM's cargo and operational arrangement.
Construction, Fabrication and Testing Requirements
Part 5, Chapter 1 addresses testing during construction. The
provisions include surveys of buoy structures, buoyancy elements,
PLEM structures and other structures, together with materials,
welding, nondestructive examination, tank and bulkhead testing,
mooring equipment, cargo transfer systems, control and safety
systems, and hoses or flexible risers.
Material Quality and Traceability
The construction quality control programme is to address
material quality, suitability and traceability, together
with the relevant certification and inspection records.
Welding and Fabrication
Welding procedure qualifications, welder qualifications,
production welding, preparation, fit-up, alignment and
inspection of fabricated components form part of the
construction control process.
Nondestructive Examination
Nondestructive testing is addressed within the construction
requirements. The applicable type and extent of NDT are
determined by the relevant Rule provisions and approved
construction documentation.
Tank and Tightness Testing
Tank, bulkhead and fitting tightness tests, hydrostatic
testing and tank tests for structural adequacy are included
in the construction testing provisions.
Mooring Equipment Tests
Fabrication and installation testing provisions address
anchor legs, mooring equipment between the vessel and SPM,
tower moorings, piles and anchors.
Cargo and Safety System Testing
The cargo transfer system, control and safety equipment,
hoses and flexible risers are subject to the applicable
examination and testing requirements.
Construction assurance:
The ABS Rules require the construction quality control programme
to address, as appropriate, material traceability, welding
qualifications and records, production welding inspection, NDT,
corrosion control systems and compartment testing. These records
support verification of the completed SPM against the approved
design and applicable Rule requirements.
Surveys After Construction
Part 5, Chapter 2 addresses surveys after construction. The Rules
distinguish annual classification surveys, drydocking surveys or
equivalent examinations, underwater survey in lieu of drydocking
(UWILD), and special periodical surveys.
Annual Classification Survey
Annual classification surveys are to be made within three
months either way of each annual anniversary date of the
crediting of the previous Special Periodical Survey or the
original construction date.
Drydocking Survey or Equivalent
The Rules require examination of the underwater parts of
each SPM and associated mooring hardware at intervals not
exceeding five years, aligned with the Special Survey due
date, subject to the applicable provisions.
UWILD
An underwater survey in lieu of drydocking may be accepted
subject to the Rule conditions, including prior submission
of the inspection procedure, attendance under the
surveillance of the attending Surveyor, and use of an
in-water survey company recognized by ABS.
Special Periodical Survey
A Special Periodical Survey is to be completed within five
years after build or after the crediting date of the
previous Special Periodical Survey, subject to the detailed
provisions of the Rules.
The Special Periodical Survey includes examination of the SPM buoy
or platform structure, mooring components, foundations and
supporting structure, underwater parts, corrosion protection,
thickness measurements, mooring hardware, cargo hoses or flexible
risers, safety equipment, swivel and cargo transfer equipment, and
electrical installations, as applicable.
UWILD acceptance:
The Rules do not make UWILD an automatic replacement for every
drydocking examination. The inspection procedure is to be submitted
for review before execution, the inspection is carried out under
the attending Surveyor's surveillance by an in-water survey
company recognized by ABS, and the SPM condition found is to be
acceptable.
Annual Survey Focus Under the July 2026 Rules
The July 2026 annual survey provisions require the maintenance and
replacement records of the SPM system to be reviewed and verified.
The attending Surveyor is to confirm compliance with the approved
Information Booklet and Maintenance Manual.
The listed records include the following equipment and systems:
Rotating Equipment
Swivels and the main bearing, including their maintenance
and replacement records.
Mooring System
Mooring system records, including connection points to the
SPM hull, together with the relevant anchoring and mooring
equipment.
Corrosion Protection
Maintenance and replacement records for the corrosion
protection system.
Hawsers
Maintenance and replacement records for hawsers and
associated vessel-to-SPM mooring components.
Hoses and Flexible Piping
Records for hoses and flexible piping, together with
applicable pressure testing and product or cargo riser
checks.
MBC and Safety Devices
Marine Breakaway Couplings and safety device testing where
provided, as specified in the annual survey provisions.
The annual survey list also includes pressure testing, PLEM when
part of the class scope, product valves, product or cargo risers,
personnel protection, loading guidance and stability data as
applicable, mooring chain tensions, hazardous-area electrical
equipment, product lines and cargo equipment, shutdown devices,
bilge pumping, ventilation, gauges and indicators, corrosion-prone
structural areas, lights and navigational aids where applicable.
Practical record review:
An effective preparation process should make the approved
Information Booklet and Maintenance Manual, maintenance history,
replacement records, test records and relevant equipment
documentation readily available for the attending Surveyor.
The actual survey scope remains subject to the Rules and the
SPM's approved class documentation.
PLEM, Underwater Parts and Corrosion Protection
Underwater components are an important part of the SPM survey
regime. The Special Periodical Survey provisions address underwater
parts of the buoy, underbuoy hoses or risers and the PLEM when it
forms part of the class scope.
Where underwater parts are inaccessible to the Surveyor, the Rules
provide for examination by a qualified diver using two-way audio
and visual communication, or by remotely operated vehicle (ROV).
The examination is to be carried out in the presence of the Surveyor
and in accordance with an accepted procedure.
Underwater Structure
The underwater examination addresses the relevant
accessible portions of the SPM and associated equipment
within the scope of the survey.
Underbuoy Hoses and Risers
Underbuoy hoses or risers are included in the underwater
survey scope as specified by the Rules and applicable
class arrangements.
PLEM
The PLEM is included in the relevant survey provisions
when it forms part of the classification scope. The
July 2026 annual survey clarification also specifies
PLEM testing when it is part of class scope.
Scour and Foundations
Any scour identified around the PLEM or foundation is to
be investigated, documented and referred to ABS
Engineering, with remedial actions applied as necessary.
Corrosion Protection
Protective systems are to be verified as effective in
accordance with the applicable provisions, including
cathodic protection readings in the circumstances
specified by the Rules.
Thickness Measurements
Thickness gauging is addressed where wastage is evident
or suspected, with representative gauging requirements
at subsequent Special Surveys as specified in the Rules.
SPM Technical Compliance and Documentation
SPM classification depends on the relationship between the approved
design, construction records, equipment certification, testing
evidence, maintenance history and surveys after construction.
Technical documentation should be maintained in a form that allows
the condition and history of the SPM system to be reviewed.
Design Documentation
Design basis, environmental data, calculations, drawings,
specifications and approved design information.
Material and Fabrication Records
Material certification, traceability, welding procedures,
welder qualifications, fabrication inspection and NDT.
Equipment Documentation
Applicable equipment certification, manufacturer
documentation, installation records and approved
technical information.
Testing Records
Construction tests, pressure tests, functional tests,
mooring tests and relevant commissioning evidence.
Maintenance and Replacement History
Records for the components and systems specified in the
approved Information Booklet and Maintenance Manual.
Survey and Condition Records
Annual survey reports, Special Periodical Survey reports,
underwater inspection records and relevant thickness
measurements.
Document consistency:
Maintenance and replacement records should be traceable to the
equipment installed on the SPM and consistent with the approved
Information Booklet and Maintenance Manual. Any proposed change
affecting classification should be handled in accordance with
the applicable ABS requirements.
Independent SPM Engineering and Technical Review
An independent technical review can help an owner or project team
examine whether the SPM design basis, engineering documentation,
equipment interfaces, construction evidence and maintenance
arrangements are coherent with the intended service and applicable
classification requirements.
The review may consider the design assumptions, environmental
criteria, mooring arrangement, structural connections, cargo
transfer systems, safety functions, inspection access and the
documentation needed to support construction, commissioning and
in-service survey activities.
The scope and depth of any review should be agreed against the
specific SPM configuration, project stage, available documentation
and classification basis. An independent consultancy review does
not replace approval, certification or survey functions reserved
to ABS or another authorized organization.
Technical independence:
PAMS Pacific Admiralty Maritime Services provides independent
marine surveying, offshore technical engineering and maritime
compliance consultancy. Any SPM assignment is defined by its
agreed engineering and technical scope, with clear separation
between independent consultancy assessment and classification
society approval or statutory authority functions.
Related PAMS SPM Technical Resources
The following PAMS pages provide additional information on SPM
engineering design basis and independent single point mooring
technical consultancy.
ABS Single Point Mooring Rules – FAQ
What are the ABS Rules for Building and Classing Single Point Moorings?
They are ABS classification rules addressing SPM-specific
conditions of classification, materials and welding,
mooring system design, equipment and systems, testing
during construction and surveys after construction.
What is the date of the latest edition discussed in this article?
This article reviews the July 2026 edition of the ABS
Rules for Building and Classing Single Point Moorings.
What are the five Parts of the ABS SPM Rules?
Part 1 covers Conditions of Classification; Part 2 covers
Materials and Welding; Part 3 covers Mooring System Design;
Part 4 covers Equipment and Systems; and Part 5 covers
Testing and Surveys.
Do the ABS SPM Rules apply to permanently moored vessels?
The Rules state that they are mainly applicable to SPM
systems designed for temporarily moored vessels. For
vessels permanently moored to an SPM, the Rules refer
to Part 3B and Part 3C of the ABS Rules for Building
and Classing Offshore Units.
What are the main changes identified in the July 2026 edition?
The Foreword identifies updates to annual survey
requirements, including review of replacement records,
expanded coverage of Marine Breakaway Couplings, safety
devices and hull mooring connections, and clarification
that PLEM testing applies when the PLEM is part of the
class scope.
Are Marine Breakaway Couplings included in the annual survey?
Yes. Marine Breakaway Couplings are expressly listed in
the annual survey provisions of the July 2026 edition,
within the applicable SPM survey scope.
Does the annual survey include PLEM testing?
The July 2026 Rules clarify that PLEM testing is included
when the PLEM forms part of the classification scope.
The applicable class scope should be checked for the
particular installation.
How often are Special Periodical Surveys required?
The Rules state that a Special Periodical Survey is to
be completed within five years after the date of build
or after the crediting date of the previous Special
Periodical Survey, subject to the detailed provisions
and any applicable authorization.
Can an underwater survey be accepted in lieu of drydocking?
UWILD can be accepted subject to the conditions in the
Rules. These include prior submission of the inspection
procedure for review, an in-water survey company
recognized by ABS, attendance under the surveillance
of the attending Surveyor and an acceptable SPM condition.
What is examined during an SPM Special Periodical Survey?
As applicable, the survey addresses the SPM buoy or
platform structure, mooring components, foundations and
supporting structure, underwater parts, corrosion
protection, thickness measurements, mooring hardware,
cargo hoses or flexible risers, safety equipment,
swivel and cargo transfer equipment, and electrical
installations.
Does an independent technical review replace ABS approval or survey?
No. An independent technical consultancy review does
not replace classification approval, certification or
survey functions reserved to ABS or another authorized
organization.
Does PAMS provide SPM technical consultancy?
PAMS Pacific Admiralty Maritime Services provides
independent marine surveying, offshore technical
engineering and maritime compliance consultancy.
SPM-related assignments are undertaken within an
agreed technical consultancy scope.
About the Technical Author
Gregory Apostologlou
Managing Director of PAMS Pacific Admiralty Maritime Services,
Mechanical Engineer and Marine Technical Superintendent with
maritime experience in marine surveying, vessel inspection,
marine engineering, offshore technical consultancy and
maritime regulatory compliance.
His technical work includes vessel condition assessment,
marine surveying, technical due diligence, offshore
engineering, FPSO/SPM technical engineering and maritime
compliance assessment.
Technical Content Review
Last Technical Review
November 2026
Review Basis
ABS Rules for Building and Classing Single Point Moorings,
July 2026 edition. The article is intended as a technical
overview and should be read together with the complete
Rules and applicable referenced ABS publications.
Primary technical reference:
American Bureau of Shipping, Rules for Building and Classing
Single Point Moorings, July 2026. Rule references and requirements
are subject to the complete publication, applicable amendments,
referenced ABS Rules and the classification scope of the
particular SPM installation.
Engineering Reference Notice
This article provides a general technical overview of selected
provisions in the ABS Rules for Building and Classing Single
Point Moorings, July 2026. It is not a substitute for the complete
ABS Rules, project-specific design calculations, approved drawings,
classification review, survey instructions or applicable
regulatory requirements. The applicability of individual
provisions depends on the SPM configuration, classification
scope, operating concept and approved project documentation.
Where a requirement is to be applied to a particular installation,
the complete Rule text and relevant referenced publications
should be consulted.
Need Independent SPM Technical Consultancy?
PAMS Pacific Admiralty Maritime Services provides independent
marine surveying, offshore technical engineering and SPM
technical consultancy. Discuss your SPM design basis,
engineering documentation, technical review or survey-related
requirements within an agreed consultancy scope.
View SPM Technical Consultancy
View SPM Design Basis